Upcoming Procurements

 

PUBLIC WORKS CONTRACTS (CONSTRUCTION)

Contract Number

Title

Int. Projected Advertisement

Rev. Projected Advertisement

Contact

Est. Value

03QJ-110A

Concord Yard Wheel Truing Facility

Dec 2023

Nov 2024

[email protected]

$37M

17HM-110 

Met-G Generator Replacement

Aug 2024

Nov 2024

[email protected]

$9M - $10M

15TC-206

Custom Fabricated Material Procurement for EBay Street Level Vent Grates

Oct 2024

Nov 2024

[email protected]

$5M

17BY-110A 

LMA UPS System Installation

Dec 2024

-

[email protected] 

$13M

 

 

Future Construction Contracts Through 2025

*DISCLAIMER:  The information provided below is preliminary and subject to change.  Bidders shall not rely on this information below in preparing any bid submittals. Information provided cannot be relied upon for activities including but not limited to design, construction, and construction management purposes.  The District will not provide any additional information or any inquiries until these contracts are advertised. 

Project Name

Contract Description

Estimated Construction Cost

Millbrae Tail Tracks ‐ Phase 2

Construction of retaining walls, drainage, etc. in support of extending tail tracks at Millbrae

$7‐$10M

Station Fire Alarm Replacement‐Phase 4

Furnish, install, test and commission the station fire alarm replacements at the following locations: El Cerrito Plaza (R40), Bay Fair (A50), South Hayward (A70), Rockridge (C10) and Concord (C60).

$4‐$7M

Water Intrusion at Train Control Room

Structural repair/restoration to train control room locations at Bay Fair (A50), Walnut Creek (C40), Dublin/Pleasanton (L30), and Richmond (R60) to
prevent water ingress.

$3‐$6M

LMA HVAC Renovation

Replace the 50‐year‐old HVAC system that serves the Lake Merritt (LMA) complex including the Operations Control Center (OCC) and computer rooms.

$10‐$15M

Control Tower HVAC (OCY, ORY)

Replace and upgrade the HVAC equipment servicing the Concord and Richmond Yard control towers.

$1‐$5M

Replace Sewage Pumps

Replace sewage pumps at 4 locations. 

$1‐$3M

Embarcadero Platform Elevator

Work at Embarcadero Station consists of the renovation of the existing hydraulic elevator, with a new elevator machine room and new stair at the south side of the station.

$10‐$15M

TBT Tunnel Lighting Replacement Phase 2- (ON HOLD - DESIGN- 02-01-2022)

Upgrade and installation of new tunnel lighting fixtures in Transbay Tube.

TBD

TP Core Capacity Project East Bay (RPA, KTF, CMR, AHM) (On Hold)

Design, procure and install three new substations - in Concord, Oakland and Richmond (CMR, KTF, RPA).
 

TBD

Re-Roof Facilities Buildings Systemwide

Replacing facility roofs on a priority basis to maintain state of good repair system-wide.

TBD

Washington Ave Steel Bridge

Repair the Washington Ave steel bridge based on the inspection performed in the previous biennial bridge inspection.

TBD

MUX Cable Replacement

Procure new cable that handles and allows simultaneous transmission of several messages and signals through a network of cable connections between the wayside train control MUX cabinets to its matching Train Control Room MUX equipment.

TBD

Dublin/Pleasanton Stn Access Improvement

Project will improve bicycle and pedestrian access to the Dublin/Pleasanton BART station by closing a gap between two existing segments of the Iron Horse Trail in Dublin (to the north) and in Pleasanton (to the south) and includes a two-way cycle track and a separated paved pedestrian path.

TBD

Pitts BayPt Mobility Improvement

Improve pedestrian and bicycle access to Pittsburg/Bay Point station by adding new cycle-track on access road to Bailey Rd.

TBD

North Berkeley Machine Room Access Improvement

This project is to create a new door to access the room that can be accessed from the station platform where patrons wait for the train.

TBD

34.5 KV AC Cable Replacement - K Line

Replace the existing 34.5kVAC cables (PIPE or PILC) on the K-Line with new ethylene propylene-rubber (EPR) jacketed medium voltage cable, fiber optic systems and install isolation disconnect switches at the substations. 

TBD

 

 

MATERIALS, EQUIPMENT & SUPPLIES 

IFB Number

Title

Int. Projected Advertisement

Contact

Est. Value

IFB 9142

Compact Crawler Boom Aerial Lift 

TBD

 [email protected]

$700K

IFB 9143

Axle Bearings Procurement

TBD

[email protected]

$1‐$5M

IFB 9144

Ph. III Mobile Genset Procurement 

TBD

[email protected] 

$475K

 

PROFESSIONAL AND OTHER SERVICES (SERVICES)

Contract Number

Title

Int. Projected  Advertisement 

Rev.Projected 

Advertisement

Contact

Est. Value

6M4874-77 

Independent Medical Examinations 

Nov 2024

TBD

[email protected]

$1.5M

6M5219

A Disparity Study for the District's DBE Program

Oct 2024

TBD

[email protected]

$500k

6M3746

eBART Track Surfacing Services

Oct 2024

TBD

[email protected]

$7M

 

MICRO SMALL BUSINESS ENTITY (MSBE) SET-ASIDE CONTRACTS/AGREEMENTS

Contract Number

Title

  Int. Projected     Advertisement  

Rev. Projected   Advertisement  

Contact

Est. Value