Search

Search Results

Concord Station garage closed starting 7/19 for lighting improvements

On Monday, July 19, 2021, the garage at Concord Station will be closed for approximately seven weeks to allow our contractor to retrofit and upgrade the garage lighting. The garage will be closed completely but surface lots will remain available for parking throughout the construction. (See map). Data shows

Notice of Public Hearing on FY2006 Budget

SAN FRANCISCO BAY AREA RAPID TRANSIT DISTRICT NOTICE OF AVAILABILITY OF PRELIMINARY BUDGET PAMPHLETS AND PUBLIC HEARING ON FISCAL YEAR 2006 BUDGET AND PROPOSED FARE SURCHARGES, FARE DISCOUNT REDUCTIONS AND PARKING FEES 9:00 A.M. THURSDAY, APRIL 28, 2005 NOTICE IS HEREBY GIVEN THAT: Preliminary budget

The Role in the Region Report

Header.png
For more than 50 years, BART has served as the Bay Area’s regional connector. By providing excellent rail service to riders of all backgrounds and abi
I. Travel and Funding ChangesBART is adapting to changes in travel and the funding landscape following the COVID-19 pandemic that upended longtime rid
BART takes college student Kassandra Santillan to her dream school, Kassandra Santillan_006.jpg, BART gave a civic architect “a sense of what was possible” for urban design, 112023_Howard Wong_220.jpg, A young woman from East Oakland says she "wouldn't be where I am today" without BART, 021024_Erica Mitchell_199.jpg, A transit wedding happened naturally for these newlyweds (Photo: Anya McInroy), Mahalia_Ben_Married-448.jpg, BART is a local teen photographer's muse, 011824_Owen Flaherty_031.jpg.png, Bay Area dad uses BART to spend time with his teenaged daughter, 112223_Ed Cabrera_098.jpg, Orion Academy in Concord relocated its campus to be closer to BART, pic2.jpg, A working mom remembers when her only downtime each day was her BART ride, Linda Healey_338.jpg, After moving away from the Bay as a child, a young rider stayed connected to the region through BART, Giovanna Lomanto_329.jpg, How BART's Small Business Support Services uplifts one trailblazing local business owner, 022624_Sandra Escalante_024.jpg, A college student’s career ambitions – and romance – blossomed thanks to BART, 021224_Kevin DeAntoni_179.jpg, Why Eric’s students at the Orientation Center for the Blind ‘fall in love’ with BART when they come to the Bay, Eric Mazariegos_533.jpg
The BART Connects storytelling series was launched in 2023 to showcase the real people who ride and rely on BART and illustrate the manifold ways the
BART takes a second-year college student to her dream school, Kassandra Santillan_006.jpg, Read the StoryIn August, Kassandra Santillan started her second year at San Francisco State University, her dream college where she studies microbiolo, BART gave a civic architect “a sense of what was possible” for urban design, 112023_Howard Wong_220.jpg, Read the Story Howard Wong grew up riding public transportation around San Francisco. He remembers well when BART opened for service in 1972; the expe, BART has carried Elvis Herselvis to drag performances for 30 years, DragKing_PChang-3394-L.jpg, Read the StoryElvis Presley loved his bubblegum pink Cadillac. Elvis Herselvis prefers a blue-and-white ride. Her vehicle is roomier than that Fleetwo, A college student’s career ambitions – and romance – blossomed thanks to BART, Picture1.jpg, Read the StoryIn just a year of riding BART, Kevin DeAntoni made a decision. When he graduates from San Francisco State in a few years, he’s going to , A young woman from East Oakland says she "wouldn't be where I am today" without BART, Picture2.png, Read the StoryBART runs like a thread through every stage of Erica Mitchell’s existence. You might say the system map is a tapestry of her life, woven, A transit wedding happened naturally for these newlyweds, Mahalia_Ben_Married-448.jpg, Read the StoryMahalia LeClerc and Benjamin Frisbey never set out to have a transit wedding. It just kind of happened that way.  “We were never like, l, A working mom remembers when her only downtime each day was her BART ride, Linda Healey_018.jpg, Read the StoryLinda Healey commuted to San Francisco from Walnut Creek for more than twenty years. When her son was young, those daily BART rides were

Repaving of Rockridge Station parking lots begins July 30

Beginning July 30 and continuing through September, crews will be working to repave the east parking lot at Rockridge Station. The existing lot has been deteriorating and is overdue for repaving. This repaving will keep the lot in good repair for another 15 years. 3 Phases for Repaving Portions of the lot

Sidewalk improvement project happening at Ashby Station through year end

Beginning September 24 and continuing through the end of the year, crews will be working to improvement the sidewalks and driveway at Ashby Station. These improvements will require the temporary relocation of Bus Stops and ADA Parking Spaces during the sidewalk construction and asphalt resurfacing (download

Escalator out of service at El Cerrito del Norte Station until December

We apologize for the inconvenience caused by the out-of-service escalator at El Cerrito del Norte Station. The main drive assembly was out of alignment and needs to be rebuilt and replaced. This is a major undertaking that will require an extensive amount of precision work. This means the escalator will be

Earthquake upgrade construction to start inside West Oakland Station

Dear Customers: Starting early July 2010, construction crews will start earthquake strengthening work inside the West Oakland Station. Crews will construct scaffolding and enclosures around work areas and at times will need to temporarily change pedestrian access inside the station. This means it may take

MTC approves funding for Oakland Airport Connector project

The Metropolitan Transportation Commission voted 6-2 today to allocate all $20 million of this year's state transportation improvement funding to the Oakland Airport Connector (OAC) project. The Oakland Airport Connector, once built, will replace the AirBART buses that often are bogged down by Hegenberger