Powell Street Station modernization/asbestos removal
As part of the project to repair water leaks and improve the Powell Street Station, contractors will be doing asbestos removal work within the station starting October 6, 2014. The work will occur between the hours of 9pm and 5am at various locations. We will be taking great care as these materials are
West Oakland Station earthquake safety work in December
As part of our 34.5KV (Electrical) Cable System Upgrade Project, construction is currently underway to install conduit and cables along the elevated structures in West Oakland. The contractor is moving into its next phase of the project which includes working inside the West Oakland Station. The work starts
Temporary parking changes in south lot at Fruitvale Station
As part of our systemwide Earthquake Safety Program, we will begin strengthening structures in the south Fee parking lot at the Fruitvale Station to better withstand future earthquakes. The station will remain OPEN for BART riders during construction. Beginning in early January 2018, work areas will be fenced
Both platform elevators at Walnut Creek Station out of service
Both the platform elevators at Walnut Creek are currently out of service. If you require an elevator to access a BART station, below are the suggested weekday alternatives while the elevator is out of service. For late night weekday service and on weekends, please see Elevator Mitigation Alternative below. If
Temporary entrances closures at Powell and Civic Center into August 2021 for escalator installation
For more information on the multi-year escalator and canopy projects, go to the Project page: www.bart.gov/about/planning/sfentrances BART closed the Market Street entrance at the corner of Market and 4th and Ellis on 9/11/2020 for escalator replacement. The entrance will remain closed into August 2021 while
Walnut Creek Station: Passenger loading north side closed 5/8-5/12
The north side of the Walnut Creek BART passenger loading zone and sidewalk (adjacent to the new residential development) will be closed for construction from Monday 5/8 to Friday 5/12. The south side passenger loading zone and sidewalk will remain open. Drivers entering the station from North California Blvd
Cell service impacted in some areas due to fire
We’ve learned some AT&T fiber was destroyed in a fire and it is impacting cellphone service while riding BART in some areas. The impact area is from Embarcadero, through the Transbay Tube and parts of the East Bay (through Oakland, Richmond, and the Caldecott BART Tunnel). This is out of BART’s control and is
Richmond-Millbrae Line weekday service to be expanded starting Sept. 10
BART will expand weekday service on the Richmond-Millbrae Line beginning Monday by adding four additional train trips in each direction from 7 to 8 pm to meet growing ridership demands. Currently the Richmond-Millbrae and Fremont-Daly City routes stop operating at around 7 pm but, beginning Monday, only the
Parking fees increase at six stations 8/1
There will be a $0.50 daily parking fee increase at six stations starting on Monday, August 1, 2016. The increased fees are as follows: West Oakland ($8.50), Hayward ($2.50), Richmond (including Capitol Corridor parking) ($3.00), Concord ($2.50), North Concord ($2.50), Coliseum ($2.00). The monthly, single
Parking fees to increase at 3 stations June 1, 2015
Chinese (在中文) Spanish (En Español) There will be a $0.50 daily parking fee increase at three stations starting in Monday, June 1, 2015. The increased fees are as follows: Millbrae ($2.50), Concord ($1.50), North Concord ($1.50). Background information on Parking FeesParking lot usage is evaluated every 6